Putting the Bathroom Back Together -- Part 3

We are still getting there, and things are coming together nicely.  Note that we are "withholding" some pictures for the end, so you'll only see snippets from now until completion.

Here's a shot of the entryway (from the master bedroom). The carpet ends in the bedroom and the floor tile begins, along with the heated floors.  YIPPEE!  This is the tile we were the least impressed with, but after it got installed, we really liked the way it looks.


This is a shot of the "curb" and the shower pan.  The "curb" is the raised surface that the glass will rest on (once it is installed).  See the really cool pebbles in the shower pan. This is definitely something that we have wanted for a while and it fits in great!


Here's Kristina's custom ledge all finished and looking good.  It is hard to discern colors from the photos, bu the tile on the wall of the showers is darker than it looks -- it is a fairly deep gray with a hint of green in it.


Here's the water closet, after drywall, but prior to painting and a toilet!


This will be the transition from the bathroom to the master closet.  The carpet hasn't been re-installed yet, but you get the idea.


More drywall shots -- this is the wall where the vanity will be installed.  You can see the electrical boxes for the vanity lights.


The water closet (after painting) -- we had to get this painted before everything else because the plumber was coming in to install the shower valve, so we had him bring the toilet back in to the water closet.


This is our new super quiet fan.  There was a decent amount of ceiling work that had to be done around the new square fan vs the rounded one we had initially.


And last but not least, a couple more pictures of the "foreman"...this time she is goofing off on the job.  She better enjoy it while she can because as soon as things get back to normal, this will not be allowed.