Master Bathroom REMOVAL

And so it begins.  Luckily for Jared (or maybe unlucky?), he has the entire week of Thanksgiving off while Kristina has to go into work (her PCBAs came into the plant the Friday before the week of Thanksgiving -- of course!).  That being said, he was able to get started and make a huge dent in the bathroom remodel.  He started with removing the toilet.  We put the the toilet in when we moved in (something about other people's toilets grosses Kristina out).  So we will be re-using the toilets in the new bathroom.  Good toilets are hard to fine and we like the ones we have!


Next Jared removed the vanity and the mirrored cabinet over the vanity.  Indy had to come in and check out the work and make sure Daddy was doing a good job.



After that Jared ripped out the shower and the rest of the tile on the floor along with all of the drywall on the walls inside the closet and the bathroom.  Luckily for us we had no major surprises that derailed us.



The sub-floor and ceiling will be the next things to go.  We have to remove the sub-floor because we are moving some plumbing, HVAC, and electrical.  Kristina also wants to insulate the floor REALLY WELL so that there isn't as much sound travelling through the floor and walls.